Click to Home

Go To Search
FacebookTwitterRSSCommunity VoiceMy Dashboard
Route 187 (Feeding Hills Rd) Reconstruction
Route 187 (Feeding Hills Rd) Reconstruction
Reconstruction and minor widening of this heavily traveled roadway are required due to an increase in traffic volume and a deteriorated pavement condition. Hazardous standing water and icing conditions occur at various locations.

Improvements will generally include the following:
  • Reconstruction of Route 187 (Feeding Hills Rd from approximately 800' east of Pontoosic Rd to the Agawam Town Line for a total distance of 0.73 miles
  • Sidewalks and drainage system construction/replacement
  • Proposed roadway width of 36' (12' lanes and 6' shoulders)

Route 187 Reconstruction Plan Set