Cowles Bridge Replacement

Project Description


The project replaces Cowles Bridge carrying Southwick Road (Routes 10/202) over the Little River. The 75% drawings include a conceptual phasing plan that will allow traffic to utilize the existing bridge while the new bridge is constructed. The project includes a realignment and widening of Southwick Road to provide turning lanes at City View Road and Mill Street. The City View Road traffic signal will be replaced and a new traffic signal is proposed at the intersection of Mill Street. Both the design and construction of the project are funded by MassDOT.

Schedule


The project is scheduled for advertising in the Spring of 2020 with an anticipated construction start later in 2020.  We will provide updated drawings and schedules as the project advances.
 

Drawings


The 75% Design Drawings can be viewed here: 75% Design Drawings

The current bridge drawings can be viewed here:  First Bridge Submission

Design Public Hearing Presentation
Updated drawings presented at the meeting can be viewed here: Dec 13th 2018 Drawings

The Powerpoint slides presented at the meeting can be viewed here: Dec 13th 2018 Presentation

Cowles Bridge Locus Plan